Up November 2005 March 2006
|
|
 |
The first stage began with cross-section forms were attached to the flat
floor section. The stem and transom are also set in place.
The marine-plywood forms are left in place to form permanent bulkheads.
However, the extension pieces on the first and second molds are only
temporary.
|